Aduunchuluun 300MW Power Plant project

Aduunchuluun Power Plant project
(100+100+100) MW
(CFB Boiler & Air cooling)

SUM
150 MW

MAK CTL PROJECT(COAL TO GASOLINE PROJECT)

SUM
22 MW

COAL MINE AND OTHER MARKET

  • Capacity 2×150 MW = 300 MW
    – 2×150 MW by 2019
  • Coal: 1.3 million tons Aduunchuluun brown coal supplied by MAK
  • Cooling system: Air cooling with low water consumption

 

  • Water: 750.000 cubic meter per year (26 l/s), supplied by MAK
  • Boiler: Circulating fluidized bed (CFB)
  • Ash handling: Landfill in the mine and use to produce bricks.
  • CAPEX: Approx. 500 million

 

Final report TEZU+Aduunchuluun+PP feasibility study+rev.2012